TCEQ's data center permit pause is over. Reviews resumed Nov 16. The ERCOT grid audit continues. See what it means for your county

Home / Power plants

Texas power plants: new permits and proposals

87 new or proposed power plants in 48 counties, from TCEQ air permits and ERCOT grid records: 40 tied to data centers, 2 industrial, 25 with no stated customer and 20 grid plants. 50 are pending or in study, 33 have an issued air permit, 4 withdrawn. Checked Nov 25, 2026.

Permitted or proposed is not built. An air permit lets a company build; it does not mean a plant exists or will be built. Sizes are shown only when ERCOT, EIA or the company states them, and labeled.

Many new Texas data centers plan their own gas turbines or engines instead of waiting for the grid. Those plants need a TCEQ air permit, and the big ones file with ERCOT to connect. We track both, county by county, and link each plant to the data center it serves when a record says so. See them on the map (square pins).

By county

Data center (40)

The permit record names a data center or computing applicant, or our tracked project records tie the plant to a data center campus.

Armstrong County · near Claude

Crusoe Goodnight Data Center power plant

Application withdrawn Data center tie

Applicant
Crusoe Energy Systems LLC
Permit
Case-by-case air permit with PSD/GHG review: 182880, GHGPSDTX268, PSDTX1698
Filed with TCEQ
Jan 30, 2026
Size
Not stated in the permit record
Who it serves
Data center: TCEQ project name 'Data Center', facility Goodnight Data Center.
Linked projects
Goodnight Campus (Google, built by Crusoe)

Official record TCEQ air permit project 404507 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Bastrop County · near Cedar Creek

PCXAUS-11 Energy Center (Burr Computer Environments)

Air permit issued Data center tie

Applicant
Burr Computer Environments Properties LLC
Permit
Standard permit for electric generating units: 184208
Filed with TCEQ
May 28, 2026
Permit issued
Jun 9, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant Burr Computer Environments Properties LLC; Burr Computer Environment Inc is the TDLR owner of the EdgeConneX EDCAUS11-16 data center buildings on FM 535.
Linked projects
EdgeConneX Cedar Creek campuses (EDCAUS)

Official record TCEQ air permit project 410401 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Bastrop County · near Cedar Creek

PCXAUS-12 Energy Center (Burr Computer Environments)

Air permit pending Data center tie

Applicant
Burr Computer Environments Properties LLC
Permit
Standard permit for electric generating units: 186119
Filed with TCEQ
Nov 23, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant Burr Computer Environments Properties LLC (same applicant as PCXAUS-11 and PCXAUS-31, projects 410401 and 417924); Burr Computer Environment Inc is the TDLR owner of the EdgeConneX EDCAUS11-16 data center buildings on FM 535; EGU standard permit 186119 received Nov 23, 2026, pending; site off FM 535 about 5.3 mi north of SH 21.
Linked projects
EdgeConneX Cedar Creek campuses (EDCAUS)

Official record TCEQ air permit project 418314 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Bastrop County · near Cedar Creek

PCXAUS-31 Energy Center (Burr Computer Environments)

Air permit pending Data center tie

Applicant
Burr Computer Environments Properties LLC
Permit
Standard permit for electric generating units: 186068
Filed with TCEQ
Nov 20, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant Burr Computer Environments Properties LLC (same applicant as PCXAUS-11, project 410401); Burr Computer Environment Inc is the TDLR owner of the EdgeConneX EDCAUS11-16 data center buildings on FM 535; site off FM 535 about 4.6 mi north of SH 21.
Linked projects
EdgeConneX Cedar Creek campuses (EDCAUS)

Official record TCEQ air permit project 417924 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Bastrop County · near 382 Earl Callahan Rd, Cedar Creek

Pacifico Cedar Creek (Pacifico CCK Energy 1)

Air permit pending Data center tie

Applicant
Pacifico Cck Energy 1 LLC
Permit
Standard permit for electric generating units: 185019
Filed with TCEQ
Aug 14, 2026
Size
Not stated in the permit record
Who it serves
Data center: Same Earl Callahan Rd site as the Project Longhorn data center building (TDLR); Community Impact reports Pacifico builds the power plant for the BlackChamber data center.
Linked projects
Project Longhorn – Building One, Cedar Creek Pacifico campus (see also edgeconnex-cedarcreek)
Note
Bastrop County and the City of Bastrop asked TCEQ for a public meeting on this registration (Oct 13 and Nov 3, 2026). News reports describe 48 turbines; TCEQ's record does not state a size.

Official record TCEQ air permit project 413471 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Borden County · near Gail

SE DC Devco power units (Borden County)

Air permit pending Data center tie

Applicant
Se DC Devco LLC
Permit
Standard permit for electric generating units: 185712
Filed with TCEQ
Oct 13, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant name SE DC Devco LLC; no data center filing found.

Official record TCEQ air permit project 416578 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Caldwell County · near Uhland

Big Watt Digital power units (Uhland)

Air permit pending Data center tie

Applicant
Big Watt Digital LLC
Permit
Standard permit for electric generating units: 185913
Filed with TCEQ
Nov 13, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant is Big Watt Digital LLC. ERCOT separately lists Big Watt Power Austin-1 in Caldwell County (29INR0167, 448.98 MW); link not confirmed.

Official record TCEQ air permit project 417340 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Caldwell County · near Martindale

Prime Data Centers power units (Caldwell County)

Air permit issued Data center tie

Applicant
Prime Data Centers LLC
Permit
Standard permit for electric generating units: 184914
Filed with TCEQ
Aug 6, 2026
Permit issued
Nov 20, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant Prime Data Centers LLC; tracked Prime AUS01/AUS02 campus in Caldwell County.
Linked projects
Prime Data Center AUS01/AUS02 (Lockhart)

Official record TCEQ air permit project 413050 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Cameron County · near Starbase

SpaceX Starbase power units

Air permit issued Data center tie

Applicant
Space Exploration Technologies Corp
Permit
Standard permit for electric generating units: 185386
Filed with TCEQ
Sep 17, 2026
Permit issued
Nov 16, 2026
Size
Not stated in the permit record
Who it serves
Data center: Tracked SpaceX Starbase gas-fired power plant and supercompute facility.
Linked projects
SpaceX Starbase gas-fired power plant and super-compute facility

Official record TCEQ air permit project 415104 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Cameron County · near Starbase

SpaceX Super-Compute Facility power units (Starbase, second registration)

Air permit pending Data center tie

Applicant
Space Exploration Technologies Corp
Permit
Standard permit for electric generating units: 186012
Filed with TCEQ
Nov 18, 2026
Size
Not stated in the permit record
Who it serves
Data center: TCEQ facility name 'Super-Compute Facility', applicant SpaceX, at SH-4 and S Port Connector Rd, Starbase; separate from issued registration 185386 (project 415104).
Linked projects
SpaceX Starbase gas-fired power plant and super-compute facility

Official record TCEQ air permit project 417654 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Carson County · near Amarillo

Fermi Project Matador gas plant (permit 1)

Air permit issued Data center tie

Applicant
Fermi Equipment Holdco, LLC
Permit
Case-by-case air permit with PSD/GHG review: 181009, GHGPSDTX254, PSDTX1670
Filed with TCEQ
Aug 1, 2025
Permit issued
Feb 25, 2026
Size
11,679 MW (EIA-860M planned generators (Sep 2026), plant 69799, planned 2030)
Who it serves
Data center: Fermi America's HyperGrid campus (tracked as Project Matador).
Linked projects
Project Matador (HyperGrid campus)

Official record TCEQ air permit project 396274 ↗ · Official record EIA-860M planned generators (Sep 2026), plant 69799, planned 2030 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Carson County · near Amarillo

Fermi Project Matador gas plant (permit 2)

Air permit pending Data center tie

Applicant
Fermi Equipment Holdco, LLC
Permit
Case-by-case air permit with PSD/GHG review: 183462, GHGPSDTX271, PSDTX1704
Filed with TCEQ
Mar 27, 2026
Size
Not stated in the permit record
Who it serves
Data center: Second Fermi Equipment Holdco application for the HyperGrid campus.
Linked projects
Project Matador (HyperGrid campus)

Official record TCEQ air permit project 407047 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Culberson County · near Orla

Prime Data Centers power units (Culberson County)

Air permit pending Data center tie

Applicant
Prime Data Centers LLC
Permit
Standard permit for electric generating units: 185945
Filed with TCEQ
Nov 16, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant is Prime Data Centers LLC.

Official record TCEQ air permit project 417395 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Deaf Smith County · near Hereford

Google Energy Center (Deaf Smith County)

Air permit pending Data center tie

Applicant
Google LLC
Permit
Case-by-case air permit with PSD/GHG review: 185289, GHGPSDTX278, PSDTX1722
Filed with TCEQ
Sep 8, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant is Google LLC; Google operates the Project Roman data center north of Hereford (tracked).
Linked projects
Project Roman (Google-operated data center north of Hereford)

Official record TCEQ air permit project 414637 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Deaf Smith County · near Hereford

Roman Energy Center (IP Roman III Gas)

Air permit pending Data center tie

Applicant
Ip Roman III Gas, LLC
Permit
Case-by-case air permit with PSD/GHG review: 184403, GHGPSDTX276, PSDTX1712
Filed with TCEQ
Jun 15, 2026
Size
1,275 MW (ERCOT GIS report (Oct 2026), 29INR0361, projected Jun 2030)
Who it serves
Data center: Shares the Project Roman name and county with the tracked Google-operated data center, where Intersect is named as developer.
Linked projects
Project Roman (Google-operated data center north of Hereford)

Official record TCEQ air permit project 411006 ↗ · Official record ERCOT GIS report (Oct 2026), 29INR0361, projected Jun 2030 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Dickens County · near Afton

Galaxy Helios power units

Air permit issued Data center tie

Applicant
Galaxy Helios I LLC
Permit
Standard permit for electric generating units: 179090
Filed with TCEQ
Feb 6, 2025
Permit issued
Mar 7, 2025
Size
Not stated in the permit record
Who it serves
Data center: Applicant Galaxy Helios I LLC; tracked Helios campus.
Linked projects
Helios data center campus (CoreWeave)

Official record TCEQ air permit project 388603 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

El Paso County · near El Paso

Integra Mission Critical power units (El Paso, 3 registrations)

Air permit pending Data center tie

Applicant
Integra Mission Critical LLC
Permit
Standard permit for electric generating units: 185906, 185907, 185908
Filed with TCEQ
Nov 13, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant is Integra Mission Critical LLC, a data center developer; site not tied to a tracked project.

Official record TCEQ air permit project 417327 ↗ · Official record TCEQ air permit project 417329 ↗ · Official record TCEQ air permit project 417461 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Glasscock County · near Garden City

St Lawrence Data Center power units (Terra Solis Gas & Oil)

Air permit pending Data center tie

Applicant
Terra Solis Gas & Oil LLC
Permit
Standard permit for electric generating units: 186016
Filed with TCEQ
Nov 18, 2026
Size
Not stated in the permit record
Who it serves
Data center: TCEQ facility name 'St Lawrence Data Center', applicant Terra Solis Gas & Oil LLC; not tied to a tracked project; size not stated.

Official record TCEQ air permit project 417700 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Hill County

Bullock Gas (Bullock Data Center LLC)

In ERCOT interconnection study (no TCEQ air permit found) Data center tie

Applicant
Bullock Data Center, LLC
Permit
ERCOT generation interconnection request
Size
1,400 MW (ERCOT GIS report (Oct 2026), 33INR0005)
Who it serves
Data center: ERCOT interconnecting entity is Bullock Data Center, LLC.
Linked projects
lead (unconfirmed)
Note
ERCOT study phase: SS Completed, FIS Started, No IA. Projected COD 2032-07-01 (developer estimate).

Official record ERCOT GIS report (Oct 2026), 33INR0005: Bullock Gas, 1400 MW ↗

Checked Nov 17, 2026. Permitted or proposed is not built.

Hill County

Liberty Thermal Energy Center (Liberty Data Center I LLC)

In ERCOT interconnection study (no TCEQ air permit found) Data center tie

Applicant
Liberty Data Center I, LLC
Permit
ERCOT generation interconnection request
Size
1,400 MW (ERCOT GIS report (Oct 2026), 33INR0006)
Who it serves
Data center: ERCOT interconnecting entity is Liberty Data Center I, LLC.
Linked projects
lead (unconfirmed)
Note
ERCOT study phase: SS Completed, FIS Started, No IA. Projected COD 2032-07-01 (developer estimate).

Official record ERCOT GIS report (Oct 2026), 33INR0006: Liberty Thermal Energy Center, 1400 MW ↗

Checked Nov 17, 2026. Permitted or proposed is not built.

Hill County · near Hubbard

Nexus Data Center Hubbard power plant

Air permit pending Data center tie

Applicant
Nexus Hubbard Power, LLC
Permit
Case-by-case air permit with PSD/GHG review: 183046, GHGPSDTX269, PSDTX1700
Filed with TCEQ
Feb 17, 2026
Size
Not stated in the permit record
Who it serves
Data center: TCEQ project name: 'Self Powered Data Center'.
Linked projects
Nexus Data Center Hubbard (self-powered)

Official record TCEQ air permit project 405217 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Hunt County · near Royse City

Prime Data Centers DFW02 power units (Royse City)

Air permit pending Data center tie

Applicant
Prime Data Centers LLC
Permit
Standard permit for electric generating units: 186093
Filed with TCEQ
Nov 20, 2026
Size
Not stated in the permit record
Who it serves
Data center: TCEQ facility name 'DFW02', applicant Prime Data Centers LLC, 8466 FM 1565, Royse City; not tied to a tracked project; size not stated; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 417982 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Kaufman County · near Terrell

Sowers I power units (Prometheus Hyperscale, near Terrell)

Air permit pending Data center tie

Applicant
Prometheus Hyperscale
Permit
Standard permit for electric generating units: 186106
Filed with TCEQ
Nov 23, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant Prometheus Hyperscale (data center developer; its Kaufman County campus is tracked as prometheus-kaufman); EGU standard permit 186106 received Nov 23, 2026, pending; site off CR 273 about 4.2 mi SW of the TX-34/FM 2578 exit, Terrell; the record does not name the campus; size not stated; no ERCOT GIS (Oct 2026) match.
Linked projects
Prometheus Hyperscale Kaufman County campus (FM 987)

Official record TCEQ air permit project 418079 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Kaufman County · near Terrell

Sowers II power units (Prometheus Hyperscale, near Terrell)

Air permit pending Data center tie

Applicant
Prometheus Hyperscale
Permit
Standard permit for electric generating units: 186108
Filed with TCEQ
Nov 23, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant Prometheus Hyperscale (tracked as prometheus-kaufman); EGU standard permit 186108 received Nov 23, 2026, pending; same CR 273 location as Sowers I (project 418079); the record does not name the campus; size not stated; no ERCOT GIS (Oct 2026) match.
Linked projects
Prometheus Hyperscale Kaufman County campus (FM 987)

Official record TCEQ air permit project 418285 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Lee County · near Lexington

Southridge Data Center power units (Southridge Energy TX)

Air permit pending Data center tie

Applicant
Southridge Energy TX LLC
Permit
Standard permit for electric generating units: 186035
Filed with TCEQ
Nov 19, 2026
Size
Not stated in the permit record
Who it serves
Data center: TCEQ facility name 'Southridge Data Center', applicant Southridge Energy TX LLC, 6208 County Road 309, Lexington; not tied to a tracked project; size not stated; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 417839 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Milam County · near Burlington

Milam East Data Center power units (SE DC Devco)

Air permit pending Data center tie

Applicant
Se DC Devco LLC
Permit
Standard permit for electric generating units: 186134
Filed with TCEQ
Nov 24, 2026
Size
Not stated in the permit record
Who it serves
Data center: TCEQ facility name 'Milam East Data Center', applicant SE DC Devco LLC, 8433 US 77, Burlington; EGU standard permit 186134 received Nov 24, 2026, pending; the record does not name SB Energy or OpenAI, so it is not linked to sb-energy-milam (also in Burlington); size not stated; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 418370 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Milam County · near Burlington

Milam West Data Center power units (SE DC Devco)

Air permit pending Data center tie

Applicant
Se DC Devco LLC
Permit
Standard permit for electric generating units: 186133
Filed with TCEQ
Nov 24, 2026
Size
Not stated in the permit record
Who it serves
Data center: TCEQ facility name 'Milam West Data Center', applicant SE DC Devco LLC, 5722 County Road 133, Burlington; EGU standard permit 186133 received Nov 24, 2026, pending; the record does not name SB Energy or OpenAI, so it is not linked to sb-energy-milam; size not stated; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 418368 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Nolan County · near Sweetwater

Nolan Ranch DC power units

Air permit issued Data center tie

Applicant
Nolan Ranch DC Owner LLC
Permit
Standard permit for electric generating units: 184114
Filed with TCEQ
May 18, 2026
Permit issued
May 22, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant name Nolan Ranch DC Owner LLC; not tied to a tracked campus.

Official record TCEQ air permit project 409580 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Pecos County · near Hwy 18, about 17 mi north of Fort Stockton

GW Ranch Energy Center (Pacifico GW)

Air permit issued Data center tie

Applicant
Pacifico Gw LLC
Permit
Case-by-case air permit with PSD/GHG review: 181033, GHGPSDTX255, PSDTX1672
Filed with TCEQ
Aug 4, 2025
Permit issued
Jan 21, 2026
Size
7,650 MW (Pacifico says the permit covers 7.65 GW (company claim))
Who it serves
Data center: Tracked with Amazon's GW Ranch AI campus.
Linked projects
GW Ranch AI campus + GW Ranch Energy Center

Official record TCEQ air permit project 396366 ↗ · Company claim Pacifico says the permit covers 7.65 GW (company claim) ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Pecos County · near Fort Stockton

Poolside Project Horizon power units

Air permit issued Data center tie

Applicant
Poolside Lf Phase 2 DC Ops LLC
Permit
Standard permit for electric generating units: 183235
Filed with TCEQ
Mar 9, 2026
Permit issued
Mar 12, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant Poolside LF Phase 2 DC Ops LLC; tracked Project Horizon.
Linked projects
Project Horizon

Official record TCEQ air permit project 406111 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Reeves County · near Pecos

Badger Generation Plant (Integra Mission Critical, Reeves County)

Air permit issued Data center tie

Applicant
Integra Mission Critical LLC
Permit
Standard permit for electric generating units: 186021
Filed with TCEQ
Nov 9, 2026
Permit issued
Nov 18, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant Integra Mission Critical LLC, a data center developer; EGU standard permit 186021 received Nov 9, issued Nov 18, 2026; off FM 2119 about 20 mi north of Pecos; not tied to a tracked project; size not stated; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 417922 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Reeves County · near Pecos

MARA-NGON power units (Reeves County)

Air permit issued Data center tie

Applicant
Mara-ngon Joint Venture LLC
Permit
Standard permit for electric generating units: 185543
Filed with TCEQ
Sep 30, 2026
Permit issued
Nov 18, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant is a MARA joint venture (bitcoin mining / computing).

Official record TCEQ air permit project 416126 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Reeves County · near Pecos

Project Frontier Tachyon9 Pecos Data Center Campus power units

Air permit pending Data center tie

Applicant
Tachyon9 Inc
Permit
Standard permit for electric generating units: 186122
Filed with TCEQ
Nov 24, 2026
Size
Not stated in the permit record
Who it serves
Data center: TCEQ facility name 'Project Frontier Tachyon9 Pecos Data Center Campus', applicant Tachyon9 Inc; south of Pecos off TX-17 and RR 1934; EGU standard permit 186122 received Nov 24, 2026, pending; not tied to a tracked project; size not stated; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 418344 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Reeves County · near Pecos

Project Kilby (Energy Forge One)

Air permit pending Data center tie

Applicant
Energy Forge One LLC
Permit
Case-by-case air permit with PSD/GHG review: 181895, GHGPSDTX260, PSDTX1684
Filed with TCEQ
Oct 17, 2025
Size
2,377 MW (ERCOT GIS report (Oct 2026): three Kilby1 blocks, 27INR0572 371 MW + 28INR0459 950 MW + 29INR0199 1,056 MW)
Who it serves
Data center: Chevron says Project Kilby will power Microsoft under a 20-year agreement (company claim, tracked under Microsoft Pecos).
Linked projects
Microsoft Pecos datacenter campus

Official record TCEQ air permit project 399548 ↗ · Official record ERCOT GIS report (Oct 2026): three Kilby1 blocks, 27INR0572 371 MW + 28INR0459 950 MW + 29INR0199 1,056 MW ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Shackelford County · near 299 FM 604, Albany

VoltaGrid ABI-1 Electric Generating Unit

Air permit issued Data center tie

Applicant
Voltagrid LLC
Permit
Case-by-case air permit with PSD/GHG review: 182467, GHGPSDTX266, PSDTX1692
Filed with TCEQ
Dec 12, 2025
Permit issued
Nov 19, 2026
Size
Not stated in the permit record
Who it serves
Data center: Our records tie VoltaGrid's ABI-1 plant to the Vantage Frontier campus (Public Citizen, Business Insider; TCEQ notice).
Linked projects
Vantage "Frontier" mega-campus

Official record TCEQ air permit project 402091 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Shackelford County · near Abilene

VoltaGrid power units (Shackelford County)

Application withdrawn Data center tie

Applicant
Voltagrid LLC
Permit
Standard permit for electric generating units: 180842
Filed with TCEQ
Jul 14, 2025
Size
Not stated in the permit record
Who it serves
Data center: VoltaGrid standard-permit registration in the county where our records tie VoltaGrid to Vantage Frontier; this registration is not named in those records.

Official record TCEQ air permit project 395504 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Taylor County · near Abilene

Crusoe Longhorn Data Center power plant (Taylor County)

Air permit pending Data center tie

Applicant
Crusoe Energy Systems LLC
Permit
Case-by-case air permit with PSD/GHG review: 182126, GHGPSDTX263, PSDTX1688
Filed with TCEQ
Nov 7, 2025
Size
Not stated in the permit record
Who it serves
Data center: TCEQ project name 'Data Center' (facility Longhorn Data Center). Which Abilene campus it serves is not stated.

Official record TCEQ air permit project 400428 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Tom Green County · near San Angelo

Westline 2335 energy facility

Air permit pending Data center tie

Applicant
Westline TX Holdings LLC
Permit
Case-by-case air permit with PSD/GHG review: 184380, GHGPSDTX275, PSDTX1710
Filed with TCEQ
Jun 12, 2026
Size
Not stated in the permit record
Who it serves
Data center: TCEQ project name is 'Data Center'; tracked as Westline 2335 data center and energy facility.
Linked projects
Westline 2335 data center and energy facility

Official record TCEQ air permit project 410954 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Ward County · near Barstow

Nscale Ward County II power units (Barstow area)

Air permit pending Data center tie

Applicant
Nscale Ward County II LLC
Permit
Standard permit for electric generating units: 184871
Filed with TCEQ
Aug 3, 2026
Size
Not stated in the permit record
Who it serves
Data center: Applicant Nscale Ward County II LLC (Nscale is an AI data center operator; its Ward County campus is our lead nscale-ward-barstow); EGU standard permit 184871 received Aug 3, 2026, pending; site on the I-20 service road in the Barstow area; the record does not say whether it is the Cedarvale site; size not stated; no ERCOT GIS (Oct 2026) match.
Linked projects
lead (unconfirmed)

Official record TCEQ air permit project 412889 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Williamson County · near Taylor

Big Watt Digital power units (Taylor)

Air permit pending Data center tie

Applicant
Big Watt Digital LLC
Permit
Standard permit for electric generating units: 185729
Filed with TCEQ
Oct 14, 2026
Size
449 MW (ERCOT GIS report (Oct 2026), 27INR0606, projected Dec 2028)
Who it serves
Data center: Tracked Taylor Technology Campus (Big Watt Digital).
Linked projects
Taylor Technology Campus (formerly Project Mustang)

Official record TCEQ air permit project 416657 ↗ · Official record ERCOT GIS report (Oct 2026), 27INR0606, projected Dec 2028 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Industrial (2)

On-site power for a factory or industrial site.

Cameron County · near Brownsville

SpaceX Brownsville power units

Air permit issued Industrial tie

Applicant
Space Exploration Technologies Corp
Permit
Standard permit for electric generating units: 185303
Filed with TCEQ
Sep 8, 2026
Permit issued
Nov 16, 2026
Size
Not stated in the permit record
Who it serves
Industrial: SpaceX site; use not stated.

Official record TCEQ air permit project 414660 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Undisclosed (25)

No record we opened says who the power is for.

Armstrong County · near Claude

Armstrong Campus Generating Facility (south of Claude)

Air permit pending Undisclosed tie

Applicant
Mitchell Holdco LLC
Permit
Standard permit for electric generating units: 185981
Filed with TCEQ
Nov 17, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant Mitchell Holdco LLC; site on CR 18 about 12.7 miles south of Claude (TCEQ); customer, fuel and size not stated.

Official record TCEQ air permit project 417527 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Bastrop County · near Orchard Rd, Cedar Creek

Bastrop 1 (Orchard Rd)

Air permit pending Undisclosed tie

Applicant
TX Power Data Opco LLC
Permit
Standard permit for electric generating units: 185558
Filed with TCEQ
Oct 1, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: TCEQ lists only the applicant, TX Power Data Opco LLC. No data center named in the record.

Official record TCEQ air permit project 416177 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Bastrop County · near Cedar Creek

Bastrop County Power Plant (Fort Worth Power Core)

Air permit issued Undisclosed tie

Applicant
Fort Worth Power Core LLC
Permit
Standard permit for electric generating units: 178505
Filed with TCEQ
Dec 9, 2024
Permit issued
Dec 20, 2024
Size
506 MW (ERCOT GIS report (Oct 2026), 26INR0560, projected Sep 2029)
Who it serves
Undisclosed: TCEQ and ERCOT list only Fort Worth Power Core LLC. We have not confirmed reports that the site is on EdgeConneX land.

Official record TCEQ air permit project 385769 ↗ · Official record ERCOT GIS report (Oct 2026), 26INR0560, projected Sep 2029 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Bastrop County · near Elgin

Manta Ray Electric Generating Facility (First Global Technology)

Air permit pending Undisclosed tie

Applicant
First Global Technology LLC
Permit
Standard permit for electric generating units: 186058
Filed with TCEQ
Nov 19, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant First Global Technology LLC; SE side of FM 1704 near Elgin, 463.122-acre Elgin Oaks LP tract; customer and size not stated; no record ties it to a tracked Bastrop project.

Official record TCEQ air permit project 417906 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Bell County · near Rogers

Bluestem Technology Park power units

Air permit pending Undisclosed tie

Applicant
Bluestem Technology Park LLC
Permit
Standard permit for electric generating units: 184984
Filed with TCEQ
Aug 12, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant Bluestem Technology Park LLC; customer not stated.

Official record TCEQ air permit project 413309 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Caldwell County · near Uhland

Caldwell Valley Propco 2 power units (Uhland)

Air permit pending Undisclosed tie

Applicant
Caldwell Valley Propco 2 LLC
Permit
Standard permit for electric generating units: 186154
Filed with TCEQ
Nov 24, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant Caldwell Valley Propco 2 LLC; south of FM 2720 and east of Farmers Road, Uhland; EGU standard permit 186154 received Nov 24, 2026, pending; customer and size not stated; the name matches Caldwell Valley Technology Park (tract-caldwell) but the record names no data center or developer, so it is not linked; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 418418 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Caldwell County · near Martindale

EDC Austin power units (Martindale)

Air permit pending Undisclosed tie

Applicant
Edc Austin LLC
Permit
Standard permit for electric generating units: 185697
Filed with TCEQ
Oct 12, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant EDC Austin LLC; customer not stated.

Official record TCEQ air permit project 416536 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Caldwell County · near Mustang Ridge

Mustang Ridge Generation Plant (Stella Power Company)

Air permit pending Undisclosed tie

Applicant
Stella Power Company LLC
Permit
Standard permit for electric generating units: 185982
Filed with TCEQ
Nov 17, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant Stella Power Company LLC; southwest of Hwy 183 and Hwy 21, Mustang Ridge; EGU standard permit 185982 received Nov 17, 2026, pending; customer and size not stated; no ERCOT GIS (Oct 2026) match; no record ties it to a tracked Caldwell project.

Official record TCEQ air permit project 417528 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Ellis County · near Midlothian

Solaris Power Solutions power units (Midlothian)

Air permit issued Undisclosed tie

Applicant
Solaris Power Solutions LLC
Permit
Standard permit for electric generating units: 185326
Filed with TCEQ
Sep 10, 2026
Permit issued
Nov 16, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Customer not stated.

Official record TCEQ air permit project 414786 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Freestone County · near Fairfield

Freestone Energy Center (American Energy II)

Air permit pending Undisclosed tie

Applicant
American Energy II LLC
Permit
Case-by-case air permit with PSD/GHG review: 185939, GHGPSDTX282, PSDTX1730
Filed with TCEQ
Nov 13, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Case-by-case construction, PSD and GHG PSD application; TCEQ lists only American Energy II LLC; no data center named; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 417385 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Guadalupe County · near Center Point Rd, near San Marcos

Evolve Energy 'Energy Support Facility' (Center Point Rd, Guadalupe County)

Air permit issued Undisclosed tie

Applicant
Evolve Energy LLC
Permit
Standard permit for electric generating units: 185103
Filed with TCEQ
Aug 23, 2026
Permit issued
Nov 16, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: TCEQ lists only the applicant, Evolve Energy LLC (standard permit 185103 for electric generating facilities, received Aug 23, issued Nov 16, 2026). Public Citizen and Rep. Rafael Anchia describe a 1,605 MW CloudBurst gas plant in Guadalupe County permitted Nov 16; no record we opened names CloudBurst, so it is not linked to cloudburst-sanmarcos.

Official record TCEQ air permit project 413773 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Martin County · near Stanton

MIP Ranch Power 1 (Digital Doodle LLC)

Air permit pending Undisclosed tie

Applicant
Digital Doodle LLC
Permit
Standard permit for electric generating units: 186090
Filed with TCEQ
Nov 20, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: TCEQ facility name 'Digital Doodle LLC MIP Ranch Power 1', applicant Digital Doodle LLC, 2732 State Hwy 137, Stanton; customer and size not stated; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 417979 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Matagorda County · near Bay City

Big Hill Energy combined-cycle plant

Air permit pending Undisclosed tie

Applicant
Big Hill Energy, L.l.c.
Permit
Case-by-case air permit with PSD/GHG review: 182795, GHGPSDTX267, PSDTX1696
Filed with TCEQ
Jan 22, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Customer not stated.

Official record TCEQ air permit project 403938 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Midland County · near Midland

Caprock Ranch Energy Facility (Enchanted Rock)

Air permit pending Undisclosed tie

Applicant
Enchanted Rock, LLC
Permit
Case-by-case air permit with PSD/GHG review: 184626, GHGPSDTX277, PSDTX1714
Filed with TCEQ
Jul 8, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Customer not stated.

Official record TCEQ air permit project 411884 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Mitchell County · near Westbrook

Mitchell Campus Generating Facility DC West (Westbrook)

Air permit pending Undisclosed tie

Applicant
Mitchell Solar LLC
Permit
Standard permit for electric generating units: 185992
Filed with TCEQ
Nov 17, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: TCEQ facility name 'Mitchell Campus Generating Facility DC West', applicant Mitchell Solar LLC; customer, fuel and size not stated.

Official record TCEQ air permit project 417546 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Pecos County · near Fort Stockton

VoltaGrid FST-2 EGU (Fort Stockton)

Air permit pending Undisclosed tie

Applicant
Voltagrid LLC
Permit
Standard permit for electric generating units: 186001
Filed with TCEQ
Nov 18, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant VoltaGrid LLC; customer not stated in the TCEQ record; no record ties it to a tracked Pecos County project.

Official record TCEQ air permit project 417570 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Pecos County · near Fort Stockton

VoltaGrid FST-3 EGU (Fort Stockton)

Air permit pending Undisclosed tie

Applicant
Voltagrid LLC
Permit
Standard permit for electric generating units: 186111
Filed with TCEQ
Nov 23, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant VoltaGrid LLC; EGU standard permit 186111 received Nov 23, 2026, pending; about 4.6 mi south of TX-18/FM 1450 near Fort Stockton; customer not stated; no record ties it to a tracked Pecos County project.

Official record TCEQ air permit project 418289 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Reeves County · near Pecos

IPP 1 (Istmo Development Holdings, near Pecos)

Air permit pending Undisclosed tie

Applicant
Istmo Development Holdings LLC
Permit
Standard permit for electric generating units: 186100
Filed with TCEQ
Nov 20, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant Istmo Development Holdings LLC; off CR 408/CR 404 north of I-20 near Pecos. Our lead prometheus-pecos-reeves (company claim) names Istmo Energy as a partner, but this record names no data center, so it is not linked.

Official record TCEQ air permit project 417995 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Reeves County · near Pecos

Pecos Power Plant

Air permit issued Undisclosed tie

Applicant
Pecos Power Plant LLC
Permit
Case-by-case air permit with PSD/GHG review: 181523, GHGPSDTX258, PSDTX1678
Filed with TCEQ
Sep 15, 2025
Permit issued
Mar 27, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Customer not stated.

Official record TCEQ air permit project 398190 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Scurry County · near Snyder

Scurry Campus Generating Facility (south of Snyder)

Air permit pending Undisclosed tie

Applicant
Scurry Solar LLC
Permit
Standard permit for electric generating units: 186087
Filed with TCEQ
Nov 20, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant Scurry Solar LLC; about 3.8 mi south of Snyder (TCEQ); same 'Campus Generating Facility' naming as the Mitchell and Armstrong registrations; customer, fuel and size not stated.

Official record TCEQ air permit project 417972 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Upton County · near Crane

Prairie Hound Ranch power units (near Crane)

Air permit pending Undisclosed tie

Applicant
Prairie Hound Ranch LLC
Permit
Standard permit for electric generating units: 186151
Filed with TCEQ
Nov 24, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant Prairie Hound Ranch LLC; about 6 mi east of Crane on SH 329, then ~3 mi NE (31.443821 N, 102.230894 W), Upton County; EGU standard permit 186151 received Nov 24, 2026, pending; customer and size not stated; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 418416 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Victoria County · near Victoria

Blue Energy Center (Brother 1)

Air permit pending Undisclosed tie

Applicant
Brother 1 LLC
Permit
Case-by-case air permit with PSD/GHG review: 185394, GHGPSDTX280, PSDTX1726
Filed with TCEQ
Sep 18, 2026
Size
780 MW (ERCOT GIS report (Oct 2026), 30INR0150, projected May 2030 (Phase 1a))
Who it serves
Undisclosed: Customer not stated.

Official record TCEQ air permit project 415122 ↗ · Official record ERCOT GIS report (Oct 2026), 30INR0150, projected May 2030 (Phase 1a) ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Webb County · near Mirando City

Webb County Energy Hub (Green Hydrogen International Corp)

Air permit pending Undisclosed tie

Applicant
Green Hydrogen International Corp
Permit
Standard permit for electric generating units: 186123
Filed with TCEQ
Nov 24, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant Green Hydrogen International Corp; off FM 649 about 5 mi south of TX-359 toward Mirando City; EGU standard permit 186123 received Nov 24, 2026, pending; customer and size not stated. Our lead data-city-webb says the company was renamed Energy Abundance and announced Data City near Laredo, but this record names no data center, so it is not linked; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 418347 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Williamson County · near Taylor

Compal USA Technology power units (Taylor)

Air permit issued Undisclosed tie

Applicant
Compal USA Technology Inc
Permit
Standard permit for electric generating units: 185221
Filed with TCEQ
Sep 1, 2026
Permit issued
Nov 18, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant Compal USA Technology Inc, 1069 FM 3349, Taylor; EGU standard permit 185221 received Sep 1, issued Nov 18, 2026; the record does not state what the units serve; size not stated; no ERCOT GIS (Oct 2026) match.

Official record TCEQ air permit project 414297 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Young County · near Graham

Graham Prime Power Facility Building 1 (Walker Ranch Development II)

Air permit pending Undisclosed tie

Applicant
Walker Ranch Development II LLC
Permit
Standard permit for electric generating units: 186113
Filed with TCEQ
Nov 23, 2026
Size
Not stated in the permit record
Who it serves
Undisclosed: Applicant Walker Ranch Development II LLC; EGU standard permit 186113 received Nov 23, 2026, pending; about 3 mi west of Graham along FM 209; customer and size not stated; no record ties it to the tracked Project Saltworks (saltworks-young), so it is not linked.

Official record TCEQ air permit project 418306 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Grid / utility (20)

Utility, cooperative or merchant plants selling power into the grid. No data center is named in their records.

Bastrop County · near 125 Old Bastrop Rd, Cedar Creek

MPH Bastrop Peakers (Bastrop Peaking Generators)

Air permit issued Grid / utility tie

Applicant
MPH Bastrop Peakers, LLC
Permit
Case-by-case air permit with PSD/GHG review: 178585, GHGPSDTX247, PSDTX1658
Filed with TCEQ
Dec 13, 2024
Permit issued
Mar 25, 2026
Size
1,104 MW (ERCOT GIS report (Oct 2026), 26INR0261, projected Dec 2027)
Who it serves
Grid / utility: Peaking plant at the existing Bastrop Energy Center site (same TCEQ regulated entity RN101056851); ERCOT lists it as grid generation.

Official record TCEQ air permit project 386107 ↗ · Official record ERCOT GIS report (Oct 2026), 26INR0261, projected Dec 2027 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Freestone County · near Jewett

NRG Jewett Energy Center

Air permit issued Grid / utility tie

Applicant
NRG Jewett Energy Center LLC
Permit
Case-by-case air permit with PSD/GHG review: 180096, GHGPSDTX251, PSDTX1668
Filed with TCEQ
May 7, 2025
Permit issued
Jan 15, 2026
Size
1,274 MW (ERCOT GIS report (Oct 2026), 29INR0150, projected Nov 2029)
Who it serves
Grid / utility: Grid plant; no data center named.

Official record TCEQ air permit project 392980 ↗ · Official record ERCOT GIS report (Oct 2026), 29INR0150, projected Nov 2029 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Gaines County · near Seminole

SPS Gaines County generation

Air permit issued Grid / utility tie

Applicant
Southwestern Public Service Company
Permit
Case-by-case air permit with PSD/GHG review: 179777, GHGPSDTX249, PSDTX1664
Filed with TCEQ
Apr 4, 2025
Permit issued
Mar 26, 2026
Size
Not stated in the permit record
Who it serves
Grid / utility: Utility plant (Southwestern Public Service).

Official record TCEQ air permit project 391250 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Grayson County · near Sherman

Rayburn Energy Station II

Air permit issued Grid / utility tie

Applicant
Rayburn Country Electric Cooperative, Inc.
Permit
Case-by-case air permit with PSD/GHG review: 181016, GHGPSDTX256, PSDTX1674
Filed with TCEQ
Aug 4, 2025
Permit issued
Mar 31, 2026
Size
570 MW (ERCOT GIS report (Oct 2026), 28INR0108, projected Feb 2028)
Who it serves
Grid / utility: Electric cooperative plant.

Official record TCEQ air permit project 396297 ↗ · Official record ERCOT GIS report (Oct 2026), 28INR0108, projected Feb 2028 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Hardin County · near Sour Lake

Legacy Power Station (Entergy Texas, Sour Lake)

Air permit pending Grid / utility tie

Applicant
Entergy Texas, Inc.
Permit
Case-by-case air permit with PSD/GHG review: 186013, GHGPSDTX283, PSDTX1732
Filed with TCEQ
Nov 18, 2026
Size
Not stated in the permit record
Who it serves
Grid / utility: Utility plant: Entergy Texas Inc case-by-case construction permit 186013, PSDTX1732 and GHGPSDTX283, received Nov 18, 2026, pending; off TX-105 about 2.7 mi east of Sour Lake; no data center named; size not stated in the record; no EIA-860M (Sep 2026) match.

Official record TCEQ air permit project 417660 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Hill County · near Grandview

NRG Prairie Energy Center

Application withdrawn Grid / utility tie

Applicant
NRG Prairie Energy Center LLC
Permit
Case-by-case air permit with PSD/GHG review: 183570, GHGPSDTX272, PSDTX1706
Filed with TCEQ
Mar 31, 2026
Size
1,253 MW (ERCOT GIS report (Oct 2026), 29INR0158, projected Dec 2030)
Who it serves
Grid / utility: Merchant/grid plant; no data center named.

Official record TCEQ air permit project 407249 ↗ · Official record ERCOT GIS report (Oct 2026), 29INR0158, projected Dec 2030 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Hood County · near Tolar

NRG Tolar power plant (withdrawn)

Application withdrawn Grid / utility tie

Applicant
NRG Tolar Power LLC
Permit
Case-by-case air permit with PSD/GHG review: 181591, GHGPSDTX259, PSDTX1680
Filed with TCEQ
Sep 19, 2025
Size
Not stated in the permit record
Who it serves
Grid / utility: Application withdrawn Jun 23, 2026.

Official record TCEQ air permit project 398373 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Hood County · near Granbury

Wolf Hollow II expansion

Air permit issued Grid / utility tie

Applicant
Wolf Hollow II Power, LLC
Permit
Case-by-case air permit with PSD/GHG review: 175173, GHGPSDTX238, PSDTX1636
Filed with TCEQ
Jan 25, 2024
Permit issued
Dec 19, 2025
Size
Not stated in the permit record
Who it serves
Grid / utility: Grid plant.

Official record TCEQ air permit project 369521 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Jack County · near Bridgeport

Jack County Generation Facility

Air permit issued Grid / utility tie

Applicant
Jack County Power, LLC
Permit
Case-by-case air permit with PSD/GHG review: 176482, GHGPSDTX240, PSDTX1640
Filed with TCEQ
May 29, 2024
Permit issued
Dec 27, 2024
Size
Not stated in the permit record
Who it serves
Grid / utility: Grid plant; no data center named.

Official record TCEQ air permit project 374481 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Jefferson County · near Port Arthur

Legend Power Station (Entergy Texas)

Air permit issued Grid / utility tie

Applicant
Entergy Texas, Inc.
Permit
Case-by-case air permit with PSD/GHG review: 176191, GHGPSDTX239, PSDTX1638
Filed with TCEQ
Apr 26, 2024
Permit issued
Apr 24, 2025
Size
754 MW (EIA-860M planned generators (Sep 2026), plant 68053, planned 2028)
Who it serves
Grid / utility: Utility plant.

Official record TCEQ air permit project 373222 ↗ · Official record EIA-860M planned generators (Sep 2026), plant 68053, planned 2028 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Lamar County · near Deport

North Royal Energy Center

Air permit pending Grid / utility tie

Applicant
North Royal Energy Center LLC
Permit
Case-by-case air permit with PSD/GHG review: 181815, GHGPSDTX262, PSDTX1682
Filed with TCEQ
Oct 10, 2025
Size
479 MW (ERCOT GIS report (Oct 2026), 28INR0087, projected Aug 2030)
Who it serves
Grid / utility: ERCOT lists it as a Texas Energy Fund due-diligence project.

Official record TCEQ air permit project 399049 ↗ · Official record ERCOT GIS report (Oct 2026), 28INR0087, projected Aug 2030 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Lamb County · near Earth

SPS Lamb County generation

Air permit issued Grid / utility tie

Applicant
Southwestern Public Service Company
Permit
Case-by-case air permit with PSD/GHG review: 182248, GHGPSDTX264, PSDTX1690
Filed with TCEQ
Nov 19, 2025
Permit issued
Aug 26, 2026
Size
Not stated in the permit record
Who it serves
Grid / utility: Utility plant (Southwestern Public Service).

Official record TCEQ air permit project 401086 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Lee County · near Lexington

Sandow Lakes Energy Station (SL Energy Power Plant I)

Air permit issued Grid / utility tie

Applicant
Sl Energy Power Plant I, LLC
Permit
Case-by-case air permit with PSD/GHG review: 177380, GHGPSDTX244, PSDTX1650
Filed with TCEQ
Aug 29, 2024
Permit issued
Oct 29, 2025
Size
1,290 MW (EIA-860M planned generators (Sep 2026), plant 68504, planned 2028)
Who it serves
Grid / utility: No data center named in TCEQ or EIA records.

Official record TCEQ air permit project 379025 ↗ · Official record EIA-860M planned generators (Sep 2026), plant 68504, planned 2028 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Lubbock County · near Lubbock

SPS Lubbock combustion turbines (Units 3 and 4)

Air permit issued Grid / utility tie

Applicant
Southwestern Public Service Company
Permit
Case-by-case air permit with PSD/GHG review: 92156, 98073, GHGPSDTX242, GHGPSDTX243, PSDTX1646, PSDTX1648
Filed with TCEQ
Aug 22, 2024
Permit issued
Feb 10, 2026
Size
Not stated in the permit record
Who it serves
Grid / utility: Utility plant (Southwestern Public Service).

Official record TCEQ air permit project 378810 ↗ · Official record TCEQ air permit project 378811 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Morris County · near Naples

Naples Power Plant (Arkansas Electric Cooperative)

Air permit issued Grid / utility tie

Applicant
Arkansas Electric Cooperative Corporation
Permit
Case-by-case air permit with PSD/GHG review: 179865, GHGPSDTX250, PSDTX1666
Filed with TCEQ
Apr 14, 2025
Permit issued
Feb 13, 2026
Size
900 MW (EIA-860M planned generators (Sep 2026), plant 68273, planned 2028)
Who it serves
Grid / utility: Electric cooperative plant.

Official record TCEQ air permit project 391582 ↗ · Official record EIA-860M planned generators (Sep 2026), plant 68273, planned 2028 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Reeves County · near Pecos

NRG Wolf Bone Energy Center

Air permit issued Grid / utility tie

Applicant
NRG Wolf Bone Energy Center LLC
Permit
Case-by-case air permit with PSD/GHG review: 181059, GHGPSDTX257, PSDTX1676
Filed with TCEQ
Aug 7, 2025
Permit issued
Aug 5, 2026
Size
1,174 MW (ERCOT GIS report (Oct 2026), 29INR0354, projected Feb 2031)
Who it serves
Grid / utility: ERCOT lists Wolf Bone North as grid generation. A separate lead says NRG and LandBridge discussed a 1.1 GW plant for a potential data center; not tied to this permit in any record.

Official record TCEQ air permit project 396507 ↗ · Official record ERCOT GIS report (Oct 2026), 29INR0354, projected Feb 2031 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

San Patricio County · near Gregory

Gregory Power Partners added unit

Air permit issued Grid / utility tie

Applicant
Gregory Power Partners LLC
Permit
Case-by-case air permit with PSD/GHG review: 87153, GHGPSDTX252, PSDTX877M1
Filed with TCEQ
May 28, 2025
Permit issued
Dec 15, 2025
Size
470 MW (ERCOT GIS report (Oct 2026), 29INR0068)
Who it serves
Grid / utility: Adds a generating unit at an existing plant.

Official record TCEQ air permit project 393704 ↗ · Official record ERCOT GIS report (Oct 2026), 29INR0068 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Upton County · near McCamey

West Royal Energy Center

Air permit pending Grid / utility tie

Applicant
West Royal Energy Center LLC
Permit
Case-by-case air permit with PSD/GHG review: 181944, GHGPSDTX261, PSDTX1686
Filed with TCEQ
Oct 23, 2025
Size
888 MW (ERCOT GIS report (Oct 2026), 28INR0086, projected Jun 2030)
Who it serves
Grid / utility: ERCOT lists it as a Texas Energy Fund due-diligence project.

Official record TCEQ air permit project 399766 ↗ · Official record ERCOT GIS report (Oct 2026), 28INR0086, projected Jun 2030 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Ward County · near Barstow

CPV Basin Ranch Energy Center

Air permit issued Grid / utility tie

Applicant
CPV Basin Ranch Holdings, LLC
Permit
Case-by-case air permit with PSD/GHG review: 175063, GHGPSDTX237, HAP85, PSDTX1634
Filed with TCEQ
Jan 12, 2024
Permit issued
Nov 25, 2024
Size
1,445 MW (EIA-860M planned generators (Sep 2026), plant 69566, planned 2029)
Who it serves
Grid / utility: Texas Energy Fund-backed grid plant.

Official record TCEQ air permit project 368773 ↗ · Official record EIA-860M planned generators (Sep 2026), plant 69566, planned 2029 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

Ward County · near Monahans

Luminant Permian Basin steam electric station units

Air permit issued Grid / utility tie

Applicant
Luminant Generation Company LLC
Permit
Case-by-case air permit with PSD/GHG review: 178462, GHGPSDTX246, PSDTX1656
Filed with TCEQ
Dec 3, 2024
Permit issued
Sep 24, 2025
Size
Not stated in the permit record
Who it serves
Grid / utility: Utility/merchant plant.

Official record TCEQ air permit project 385412 ↗

Checked Nov 25, 2026. Permitted or proposed is not built.

How we track power plants

  • TCEQ air permits: the NSR Air Permits database. We include new case-by-case permits with PSD/greenhouse gas review (large gas plants) received since 2024, and standard-permit registrations for electric generating units filed by data center or computing applicants, or tied to a project we track. Small backup generators at stores, schools and oil fields are left out.
  • ERCOT: the monthly Generator Interconnection Status (GIS) report, for megawatts, projected dates and requests filed by data center companies.
  • EIA-860M: the federal monthly inventory of planned generators, for megawatts.

Each plant lists its permit numbers, its source links and the date we last checked it. We re-check every plant against TCEQ and look for new filings on our daily source scan. Members get an alert when a power plant permit is filed or changes status in their counties: start a free 30-day trial.

Spot an error or a missing plant? Email [email protected] with the permit number.

Free

Get the free weekly digest for your county

Free weekly email every Friday for your first month, for 1 county you pick: new commissioners court actions, permits, filings and hearings, plus the week's top Texas changes. Every item links to its public source.

Same-day alerts come with Neighbor ($4/mo).