Texas chip plants: semiconductor fabs and proposals
15 semiconductor fabs and wafer plants in 8 counties, from TCEQ air permits, state tax-break filings and CHIPS Act records: 1 proposed, 5 permitted or with incentives approved, 9 existing plants. Counted separately from data centers. Checked Nov 25, 2026.
Proposed or permitted is not built. A tax-break application or air permit does not mean a plant exists or will be built. Dollar figures are shown only when an official record or a labeled company statement gives them.
Chip factories ("fabs") use large amounts of power and water and often ask for the same local and state tax breaks as data centers. We track the ones with public records, county by county.
Proposed: JETI application filed Nov 23, 2026; Comptroller recommendation posted Nov 24Chip plant
Company
TSMC Arizona Corporation (applicant)
What it is
Proposed leading-edge logic fab campus (2-nanometer and more advanced, per the application)
Site
6550 Koppe Bridge Rd, College Station
State tax records
JETI J0055 (comptroller recommendation posted)
Investment
Estimated $22.6 billion, per the filing
Next step
Dec 10, 2026, 5 PM: College Station ISD board public hearing, 1812 Welsh Ave., College Station. After the hearing the board may designate the reinvestment zone and vote on the JETI agreement.
Note
TSMC Reinvestment Zone #1 (proposed), about 3,232 acres just south of College Station around Koppe Bridge Rd and Hopes Creek Rd (school district notice). The application says TSMC is still comparing the site with Arizona and calls the school tax limit a determinative factor (company statement in the filing).
Checked Nov 25, 2026. Proposed or permitted is not built.
Permitted or incentives approved (5)
An air permit was issued or state or local incentives were approved. That alone does not mean the plant is built or running.
Grayson County · Sherman
GlobalWafers America 300-mm wafer plant
Air permit 177337 issued Jan 8, 2026; CHIPS award finalChip plant
Company
GlobalWafers America, LLC
What it is
Silicon wafer manufacturing plant (makes the wafers chips are built on)
Site
3230 Northgate Drive, Sherman
Air permits
177337
State tax records
1 Chapter 313 agreement
Note
Wafer plant, not a chip fab: it supplies silicon wafers to fabs. The CHIPS award also covers converting part of the existing Sherman epitaxy plant to silicon carbide epitaxy.
Eight JETI applications (Anderson-Shiro CISD J0035-J0038, Iola ISD J0039-J0042), each with a signed agreement. No TCEQ air permit for the fab or its planned on-site power found in a Nov 24, 2026 search. Full record trail on our Terafab tracker.
Checked Nov 25, 2026. Proposed or permitted is not built.
Travis County · Austin
Tesla Semiconductor 'Austin Semiconductor Fab'
Air permit-by-rule registration 185814 issued Nov 2, 2026Chip plant
Company
Tesla Semiconductor, LLC
What it is
Semiconductor manufacturing facility (TCEQ project type); products not stated in the record
Site
1424 Robotic Ave, Austin
Air permits
185814
Note
TCEQ project 416941, received Oct 29, 2026. A permit-by-rule registration covers smaller emission sources; it does not describe the plant's size or start date.
CHIPS Act: the U.S. Commerce Department's CHIPS for America project pages. A preliminary memorandum of terms is not a final award.
Local records: school district hearing notices, county and city abatement agendas and the Governor's office.
Each plant lists its permit and filing numbers, its source links and the date we last checked it. We re-check every plant and look for new filings on our daily source scan. Members get an alert when a chip plant filing is added or changes in their counties: start a free 30-day trial.
Spot an error or a missing plant? Email [email protected] with the record link.