Alpha Digital Campus (PowerBridge on LandBridge land)

PowerBridge LLC (developer); LandBridge Company LLC (landowner)

In short: Location: Near the Waha natural gas hub (LandBridge), Reeves County, Texas. Status: Proposed (lease option; ERCOT interconnection study). Developer or parties: PowerBridge LLC (developer); LandBridge Company LLC (landowner). Size: Option to lease up to ~3,400 acres; up to 2 GW of initial co-located power generation (LandBridge). ERCOT lists a 58.26 MW gas combined-cycle unit with co-located load… Latest record (Oct 19, 2026): Comptroller list: 'Alpha Digital Campus' registered Qualifying Large Data Center Project; owner, occupant and operator Powerbridge LLC. Last verified Oct 5, 2026.

Status
Proposed (lease option; ERCOT interconnection study)
Developer / parties
PowerBridge LLC (developer); LandBridge Company LLC (landowner)
Location
Near the Waha natural gas hub (LandBridge), Reeves County
Size
Option to lease up to ~3,400 acres; up to 2 GW of initial co-located power generation (LandBridge). ERCOT lists a 58.26 MW gas combined-cycle unit with co-located load (28INR0499) (ERCOT GIS report)
Last verified
2026-10-05

Milestones

Figures are attributed in parentheses to the outlet or company that reported them. Where sources disagree, we show both.

  1. Apr 2 2026 LandBridge announced a lease development agreement giving PowerBridge an option to lease the acreage
  2. first power delivery anticipated 2027, large-scale generation 2028 (LandBridge, company; DCD)
  3. ERCOT GIS report (Sep 2026, published Oct 1 2026) lists 28INR0499 "Alpha Digital Campus Combined-cycle and Co-located Load", PowerBridge LLC, Reeves County, POI 38044 TNCOWPEN 345 kV, screening study started Apr 6 2026 and completed Apr 28 2026, FIS requested Jul 9 2026, status "SS Completed, FIS Started, No IA", projected COD Dec 31 2027 (ERCOT, official)

Linked power & water

Power

  • Company claim Up to 2 GW co-located generation: Up to 2 GW of initial co-located power generation (LandBridge). landbridgeco.com ↗
  • Official record ERCOT 28INR0499 combined-cycle + co-located load: ERCOT GIS report lists 'Alpha Digital Campus Combined-cycle and Co-located Load', PowerBridge LLC, POI TNCOWPEN 345 kV (ERCOT). ercot.com ↗

Power and water projects tied to this data center: on-site or dedicated generation, utility and grid capacity deals, substations, water supply, reclaimed water and wastewater permits. Each item is labeled by source type.

Land, jobs & economic impact

No land purchase, jobs or economic impact figure from a deed, agreement, filing or company release has been found for this project yet.

Related records

2026-10-19
State action Official record Reeves County · Alpha Digital Campus (PowerBridge on LandBridge land)

Comptroller list: 'Alpha Digital Campus' registered Qualifying Large Data Center Project; owner, occupant and operator Powerbridge LLC.

Source: comptroller.texas.gov ↗
2026-10-01
Grid/ERCOT Official record Reeves County · Alpha Digital Campus (PowerBridge on LandBridge land)

ERCOT GIS report: PowerBridge 'Alpha Digital Campus Combined-cycle and Co-located Load', 58.26 MW gas, Reeves; FIS started; projected COD Dec 31 2027.

Source: ercot.com ↗
2026-04-02
Company announcement Company claim Reeves County · Alpha Digital Campus (PowerBridge on LandBridge land)

LandBridge gives PowerBridge option to lease ~3,400 Reeves County acres for Alpha Digital Campus with up to 2 GW co-located power.

Source: landbridgeco.com ↗

Sources

Found an error? Email [email protected] with a source link.

Free

Get the free weekly digest for your county

Free weekly email every Friday for your first month, for 1 county you pick: new commissioners court actions, permits, filings and hearings, plus the week's top Texas changes. Every item links to its public source.

Same-day alerts come with Neighbor ($4/mo).