Alpha Digital Campus (PowerBridge on LandBridge land)
PowerBridge LLC (developer); LandBridge Company LLC (landowner)
In short: Location: Near the Waha natural gas hub (LandBridge), Reeves County, Texas. Status: Proposed (lease option; ERCOT interconnection study). Developer or parties: PowerBridge LLC (developer); LandBridge Company LLC (landowner). Size: Option to lease up to ~3,400 acres; up to 2 GW of initial co-located power generation (LandBridge). ERCOT lists a 58.26 MW gas combined-cycle unit with co-located load… Latest record (Oct 19, 2026): Comptroller list: 'Alpha Digital Campus' registered Qualifying Large Data Center Project; owner, occupant and operator Powerbridge LLC. Last verified Oct 5, 2026.
- Status
- Proposed (lease option; ERCOT interconnection study)
- Developer / parties
- PowerBridge LLC (developer); LandBridge Company LLC (landowner)
- Location
- Near the Waha natural gas hub (LandBridge), Reeves County
- Size
- Option to lease up to ~3,400 acres; up to 2 GW of initial co-located power generation (LandBridge). ERCOT lists a 58.26 MW gas combined-cycle unit with co-located load (28INR0499) (ERCOT GIS report)
- Last verified
- 2026-10-05
Milestones
- Apr 2 2026 LandBridge announced a lease development agreement giving PowerBridge an option to lease the acreage
- first power delivery anticipated 2027, large-scale generation 2028 (LandBridge, company; DCD)
- ERCOT GIS report (Sep 2026, published Oct 1 2026) lists 28INR0499 "Alpha Digital Campus Combined-cycle and Co-located Load", PowerBridge LLC, Reeves County, POI 38044 TNCOWPEN 345 kV, screening study started Apr 6 2026 and completed Apr 28 2026, FIS requested Jul 9 2026, status "SS Completed, FIS Started, No IA", projected COD Dec 31 2027 (ERCOT, official)
Linked power & water
Power
- Company claim Up to 2 GW co-located generation: Up to 2 GW of initial co-located power generation (LandBridge). landbridgeco.com ↗
- Official record ERCOT 28INR0499 combined-cycle + co-located load: ERCOT GIS report lists 'Alpha Digital Campus Combined-cycle and Co-located Load', PowerBridge LLC, POI TNCOWPEN 345 kV (ERCOT). ercot.com ↗
Land, jobs & economic impact
Related records
Comptroller list: 'Alpha Digital Campus' registered Qualifying Large Data Center Project; owner, occupant and operator Powerbridge LLC.
Source: comptroller.texas.gov ↗ERCOT GIS report: PowerBridge 'Alpha Digital Campus Combined-cycle and Co-located Load', 58.26 MW gas, Reeves; FIS started; projected COD Dec 31 2027.
Source: ercot.com ↗LandBridge gives PowerBridge option to lease ~3,400 Reeves County acres for Alpha Digital Campus with up to 2 GW co-located power.
Source: landbridgeco.com ↗Sources
- Company claim landbridgeco.com
- Official record ercot.com
- News report datacenterdynamics.com