Texas Data Center Watch tracks three data center projects in Reeves County.
Microsoft Pecos datacenter campus is listed as announced. On June 22, 2026, Microsoft announced a new Pecos campus of about 2 GW. Chevron signed a 20-year agreement to supply it from co-located Project Kilby (~2.67 GW); first power targeted 2028 (Microsoft; Chevron).
Alpha Digital Campus (PowerBridge on LandBridge land) near the Waha natural gas hub is listed as proposed (lease option; ERCOT interconnection study). On April 2, 2026, LandBridge announced a lease development agreement giving PowerBridge an option to lease up to about 3,400 acres, with up to 2 GW of initial co-located power generation; first power anticipated 2027 and large-scale generation 2028 (LandBridge; DCD). ERCOT's GIS report (Sep 2026, published Oct. 1, 2026) lists 28INR0499 "Alpha Digital Campus Combined-cycle and Co-located Load," PowerBridge LLC, Reeves County: 58.26 MW gas combined-cycle with co-located load; FIS started; projected COD Dec. 31, 2027 (ERCOT).
Added since the Oct. 16 page update:
- Core Scientific Pecos campus (AI/HPC expansion), Pecos: listed as under construction (company). Developer, per the tracker: Core Scientific (investors.corescientific.com · DCD).
Tracked projects
| Project | Developer | Status | Capacity / size | Investment | Key dates | Sources |
|---|---|---|---|---|---|---|
| Microsoft Pecos datacenter campus, Pecos | Microsoft; Chevron (power via Project Kilby gas plant) | Announced | 2 GW; co-located gas plant planned up to 2.67 GW | "Multibillion-dollar" | Jun 22 2026 announced · build over 5–7 years · first power from Chevron plant targeted 2028 | Microsoft · DCD · Chevron |
| Alpha Digital Campus (PowerBridge on LandBridge land), Near the Waha natural gas hub (LandBridge) | PowerBridge LLC (developer); LandBridge Company LLC (landowner) | Proposed (lease option; ERCOT interconnection study) | Option to lease up to ~3,400 acres; up to 2 GW of initial co-located power generation (LandBridge). ERCOT lists a 58.26 MW gas combined-cycle unit with co-located load (28INR0499) (ERCOT GIS report) | Not recorded | Apr 2 2026 LandBridge announced a lease development agreement giving PowerBridge an option to lease the acreage · first power delivery anticipated 2027, large-scale generation 2028 (LandBridge, company · DCD) · ERCOT GIS report (Sep 2026, published Oct 1 2026) lists 28INR0499 "Alpha Digital Campus Combined-cycle and Co-located Load", PowerBridge LLC, Reeves County, POI 38044 TNCOWPEN 345 kV, screening study started Apr 6 2026 and completed Apr 28 2026, FIS requested Jul 9 2026, status "SS Completed, FIS Started, No IA", projected COD Dec 31 2027 (ERCOT, official) | LandBridge · ERCOT · DCD |
| Core Scientific Pecos campus (AI/HPC expansion), Pecos | Core Scientific | Under construction (company) | Plan to expand to 1.5 GW gross power; incremental 300 MW of gross utility capacity under contract; 200+ acres secured; behind-the-meter plan (Core Scientific, Apr 27 2026) | Not recorded | Apr 27 2026 expansion plan announced · precast walls arriving as project moves to vertical construction · initial capacity expected early 2027 (Core Scientific) | investors.corescientific.com · DCD |
Recorded benefits and concerns (Microsoft Pecos datacenter campus):
- Benefits: 6,000+ peak construction jobs
- Concerns: New gas-fired generation
Sources for each project are linked in the table. Figures labeled "company" come from the developer.
Record timeline
| Date | Type | What happened | Source |
|---|---|---|---|
| Oct 1, 2026 | Grid/ERCOT | ERCOT GIS report: PowerBridge 'Alpha Digital Campus Combined-cycle and Co-located Load', 58.26 MW gas, Reeves; FIS started; projected COD Dec 31 2027. | ERCOT |
| Sep 28, 2026 | TCEQ permit | Public Citizen: permit-by-rule for the Project Kilby power plant (Chevron/Microsoft) reached engineer initial review Sep 28. | Public Citizen |
| Jun 22, 2026 | Company announcement | Microsoft announces 2 GW Pecos datacenter campus. | Microsoft |
| Jun 22, 2026 | Company announcement | Chevron signs 20-year power agreement to supply Microsoft's West Texas data center. | Chevron |
| Apr 2, 2026 | Company announcement | LandBridge gives PowerBridge option to lease ~3,400 Reeves County acres for Alpha Digital Campus with up to 2 GW co-located power. | LandBridge |
| Oct 17, 2025 | TCEQ permit | Energy Forge One submitted TCEQ air application 181895 for the Kilby gas power plant. | TCEQ |
What's next
These dates come from the tracker. Texas Data Center Watch has no recorded upcoming Reeves County hearings or votes on data centers.
- 2027–2028: LandBridge anticipates first power delivery in 2027 and large-scale generation in 2028 (LandBridge).
- Dec. 31, 2027: ERCOT's projected COD for the Alpha Digital Campus combined-cycle unit (ERCOT).
- 2028: First power from Chevron's Project Kilby for Microsoft's campus is anticipated (Chevron).
- Statewide permit pause: Under the Governor's Sept. 21 order halting permits sought by data centers (Governor's office), TCEQ sent its Oct. 19 compliance letter: it says permits for infrastructure directly supporting data centers are paused, pending applications are being screened, and claimed authorizations are suspended where possible (TCEQ letter). The Texas Tribune reported Oct. 20 that TCEQ says stormwater permits flagged by Public Citizen were suspended (Texas Tribune). On Oct. 21 TCEQ posted that its STEERS e-filing system for automatic authorizations is temporarily shut down so staff can check whether applications relate to data centers (TCEQ STEERS notice); the Texas Tribune reports a spokesman said applications must be physically provided (Texas Tribune, Oct. 21). The tracker doesn't show whether any project in Reeves County has a pending TCEQ permit.
Frequently asked questions
What data center projects are tracked in Reeves County, Texas? Three: Microsoft Pecos datacenter campus in Pecos, listed as announced; Alpha Digital Campus (PowerBridge on LandBridge land) near the Waha natural gas hub (LandBridge), listed as proposed (lease option; ERCOT interconnection study); Core Scientific Pecos campus (AI/HPC expansion) in Pecos, listed as under construction (company).
How will Microsoft's Pecos campus be powered? By a co-located Chevron natural gas plant, Project Kilby, of about 2.67 GW, under a 20-year agreement (Chevron).
What is the Alpha Digital Campus? A PowerBridge development on LandBridge land near Waha, with an option to lease up to about 3,400 acres and up to 2 GW of initial co-located generation (LandBridge). ERCOT lists a 58.26 MW combined-cycle unit with co-located load (ERCOT).
Get alerts for Reeves County
- Free: Add Reeves County to your free Community weekly digest (1 county).
- $4/mo or $36/yr: Neighbor sends same-day alerts when new Reeves County agenda items, TCEQ filings, or abatement applications appear. It also includes comment-deadline reminders. It's free on request if cost is a barrier.
Free Friday digest: Get alerts for this county (one county, free for your first month). Same-day alerts from $4/mo on Pricing.
Texas Data Center Watch is independent. No paid placement, and paying subscribers never change what this page says. See an error or a missing project? Tell us at [email protected].
Free
Get the free weekly digest for your county
Free weekly email every Friday for your first month, for 1 county you pick: new commissioners court actions, permits, filings and hearings, plus the week's top Texas changes. Every item links to its public source.
Same-day alerts come with Neighbor ($4/mo).