Abernathy AI data center campus (Fluidstack / TeraWulf joint venture)

Fluidstack (majority after Jul 2026 sale); TeraWulf (minority); Google (lease backstop, per DCD)

Status
In development
Developer / parties
Fluidstack (majority after Jul 2026 sale); TeraWulf (minority); Google (lease backstop, per DCD)
Location
Abernathy, Hale County, Lubbock County
Size
168 MW critical IT load (TeraWulf; DCD). Site county not stated in opened sources; Abernathy lies in Hale and Lubbock counties (DCD)
Last verified
2026-10-18

Milestones

Figures are attributed in parentheses to the outlet or company that reported them. Where sources disagree, we show both.

  1. Oct 2025 TeraWulf and Fluidstack formed the joint venture, Google-backed (DCD)
  2. 2026 TeraWulf sold its majority interest to Fluidstack (TeraWulf)

Linked power & water

Power

  • Company claim Xcel Energy / Southwestern Public Service (SPP) 345 kV interconnection: Abernathy site: 120 acres, grid SPP, utility Xcel Energy – Southwestern Public Service territory, 345 kV interconnection; power 100% passed through to the tenant (TeraWulf investor presentation filed with the SEC, Oct 2025). sec.gov ↗

Power and water projects tied to this data center: on-site or dedicated generation, utility and grid capacity deals, substations, water supply, reclaimed water and wastewater permits. Each item is labeled by source type.

Related records

No separate dated records yet.

Sources

Found an error? Email [email protected] with a source link.

Free

Get the free weekly digest for your county

Free weekly email every Friday for your first month, for 1 county you pick: new commissioners court actions, permits, filings and hearings, plus the week's top Texas changes. Every item links to its public source.

Same-day alerts come with Neighbor ($4/mo).